Paperless Drywall Plant

Paperless Drywall Plant
Paperless Drywall Plant

For 20 years, LVJOE is dedicated to developing and manufacturing of gypsum and plaster architectural material production equipment. The paperless drywall plant is one of our classic solutions. Our paperless drywall plant has a production power of 2 million m2/year - 50 million m2/year, the products are of high quality.

We offer paperless drywall plant turnkey project service. We offer a series of services, including plant design, construction, production line commissioning, operations, training, maintenance, upgrades, etc. Services we also offer:

  • Paperless drywall material testing and evaluation;
  • Paperless drywall production devices design and consultant;
  • For technical problems, we offer analysis and technical modification services, to help you improve product quality and save cost;
  • Full plant production management and maintenance service, for better economic returns;
  • Factory designing and planning.
Procedures

Our paperless drywall plant is highly automated, which consists of:

Features:
  • PLC controlled feeding, proportioning accuracy up to 5‰.
  • Control system ensures that boards are even, deviation under 0.1mm.
  • Meshes are evenly arrange inside the broads, which assure much better mechanical performance.
  • Follow-up cutting-off machine: friction dynamic transmission, grants better cutting accuracy, deviation under 1mm.
  • New dryer design: conduction oil and hot air convection drying process; evaporated water energy consumption reduced from 1000 kcal/kg to 800 kcal/kg, which is energy-saving. Side cooling mechanism applied to avoid over-burning, and ensure drying quality.
Gallery

Get in touch with us

Related products
Send Message