The submerged arc welding machine is mainly used for submerged arc welding of assembling finished box girder. The backing welding and electroslag welding (ESW) finished box girder will be transported to the processing station of submerged welding. It is put on the work frame with welding seam side up. The lifting welding arm equipped with submerged welding torch, wire feeding machine, welding seam tracking frame etc. can do horizontal and vertical movement on the cantilever beam through adjustment. The welding nozzle of the welding torch should be aimed at the welding seam. Then start the welding machine, and the machine will travel straight along the rail, thus realizing automatic welding of the box girder welding seam.

Technical parameter
Applicable workpiece width 300~1200 mm
Applicable workpiece height 300~1200 mm
Rail length 20000 mm
Welding speed 0.24~2.4 m/min
Non welding travel speed 3000mm/min
Box girder length 4000-15000mm
Welding speed 240-2400mm/min
Welder DC1000/AC1200 welder

Technical features
The submerged arc welding machine has the following features

1. Each group of welding arm is equipped with double arc double wire welding head. The wire feeding machine of the welding machine is installed on the top end of the welding arm, while the welding torch and mechanical tracking device is installed on the bottom end of the welding arm.
2. The welding arm adopts chain drive and weight tension device, so that it has good performance in floating tracking.
3. The horizontal tracking adopts cylinder press and is compensated in order to ensure the tracking of welding seam effectively.
4. The submerged arc welding machine adopts AC frequency speed control, so that it has large range of speed adjustment which can meet the demand of different welding speed. It has fast return stroke and stable running.
5. The machine also has the following features: simple operation and convenient maintenance.

Jinfeng introduction
Jinfeng has 2 large specified accessory warehouse with sufficient stock, so that we can provide service in time.
We have a stable sales team. All the members of the sales team have more than 10 years of experience in service, so that they can provide customers with various consultation and services rapidly, in time and expertly. Our executive vice president leads an after-sales service team of 30 employees, so that they can provide 24-hour after-sales service all year round.

Jinfeng Welding & Cutting Machinery Manufacture Co., Ltd hires senior engineers from ESAB to lead mechanical department, electrical department and software department. There are 80 people in the team in total. They will carry out development and design of various structural steel H beam production lines, so that we have technical guarantee.

Jinfeng has strong production capacity: we have 13 imported CNC machining centers, 3 4mx12m large machining centers and 300 equipment sets such as CNC grinding machine, drilling machine and milling machine etc.

We also have specified hardware processing workshop, plate welding workshop, assembly shop, packaging shop, painting and drying shop etc.

The key part of the complete submerged arc welding machine is rack assembly which is carried out by CNC machining center.

Meanwhile, it can be multi-surface processed. So the installation precision and machine service life can be ensured.

We have a technical team with 80 employees, providing R&D, design, training and after-sales service.

Related products